Assignment: To design a temporary bridge for the The Liliputian Olympics.
Design Constraints:
- Able to hold 20 lbs for 1min
- Use least number of pieces possible
- Construction time needs to be as quick as possible.
- Prefabricated parts need to be 10.5"x8"x6"
- Use less than 400 parts.
Constraints |
The class was taught how to use West Point Bridge Design to test designs.
One week was given to come up with initial designs and a working bridge model.
Plan:
Meet on Sunday Afternoon and work on designs and testing as group and divide up paperwork evenly between group members.